Introduction

In 2024, a passionate entrepreneur aimed to launch a commercial dairy farming venture to serve the increasing demand for fresh milk and dairy products in the region. However, turning the vision into reality required substantial funding from banks and access to government subsidies.

Loan approval through MSME schemes, NABARD, or Stand-Up India mandated a professionally drafted Detailed Project Report (DPR) that demonstrated the technical feasibility, financial viability, and regulatory compliance of the project. The entrepreneur approached Sigma Solutions for expert support in preparing a lender-ready DPR.

Challenges Faced by the Entrepreneur

1. Lack of Business Structuring

  • The idea was strong, but there was:
    • No financial plan
    • No technical structure for operations, staffing, or livestock management
    • No strategy to show investor or bank viability

2. No Financial Projections

  • Banks needed:
    • 5-year cash flow and profit projections
    • Breakdown of capital investment, operational costs, and breakeven point
    • ROI and IRR calculations
  • The entrepreneur had no background in financial modelling

3. Compliance & Licensing Confusion

  • Unaware of required registrations and permits, including:
    • FSSAI License
    • Pollution Control Board NOC
    • Veterinary & Animal Husbandry approvals

4. Roadblocks in Loan & Subsidy Applications

  • Rejected initial application due to:
    • Incomplete project documentation
    • No mention of subsidy eligibility or land clearance status

5. No DPR Format or Guidance

  • The entrepreneur didn’t know:
    • What a DPR should contain
    • How to align it with banking or NABARD norms
    • How to submit and follow up with financing institutions

Solution Provided by Sigma Solutions

Sigma Solutions offered an end-to-end DPR drafting service that included financial forecasting, technical feasibility study, compliance advisory, and structured documentation to meet banking and subsidy guidelines.

Implementation Strategy

1. Business Consultation & Model Structuring

  • Conducted:
    • Location feasibility study
    • Demand-supply analysis for dairy products in the region
    • Cost projection for cattle, feed, infrastructure, cold storage, and delivery logistics
  • Designed a viable business model showing:
    • Revenue channels (milk sales, manure sales, processing potential)
    • Operational scalability
    • Initial funding and working capital requirements

2. DPR Drafting – Technical + Financial Sections

  • Prepared a comprehensive DPR that included:
    • Executive Summary
    • Objectives & Market Analysis
    • Capacity & Production Planning
    • Technical layout (sheds, storage, water, feed)
    • Manpower Planning
    • Environmental and risk assessment
  • Detailed financial projections:
    • Capital Expenditure (CapEx)
    • Operating Expenditure (OpEx)
    • Break-even analysis
    • Cash flow and ROI calculations for 5 years
    • Cost-benefit ratio in line with bankable project formats

3. Compliance & Licensing Support

  • Advised and documented the process for:
    • FSSAI License
    • Veterinary Department Clearance
    • Pollution Control Registration
    • Electricity, land, and water use permissions
  • Ensured DPR highlighted risk mitigation strategies and legal adherence

4. Loan & Subsidy Facilitation

  • Aligned the DPR to meet:
    • NABARD Dairy Entrepreneurship Development Scheme (DEDS)
    • MSME Credit Guarantee Scheme (CGTMSE)
    • Stand-Up India scheme format
  • Supported:
    • Bank application submission
    • Loan follow-ups and queries resolution
    • Identification of suitable government grants and dairy startup subsidies

5. Post-DPR Advisory

  • Assisted with:
    • Vendor and equipment sourcing strategy
    • Timeline planning for implementation
    • Setting up a progress monitoring framework for fund utilization and operations

Results Achieved

Outcome

Details

DPR Completed in 15 Days

Professionally structured and submitted to the funding institution

Loan Approved

Received funding under a government-backed MSME loan scheme

Full Regulatory Compliance

All required licenses and permits secured

Structured Roadmap for Operations

Enabled the entrepreneur to implement the dairy farm phase-wise

Government Subsidy Eligibility

Qualified for capital subsidy and interest subvention schemes

Conclusion & Key Takeaways

A Detailed Project Report (DPR) is the foundation of any successful funding application, especially for capital-intensive projects like dairy farms. It acts as both a business plan and a compliance roadmap for financial institutions, government bodies, and private investors.

With the help of Sigma Solutions, the entrepreneur received a bankable DPR, unlocked funding, and aligned the project with regulatory, technical, and financial best practices.

Key Learnings:

  • A DPR must include realistic projections, risk planning, and compliance sections
  • Aligning the DPR with loan-specific formats increases funding approval chances
  • A well-crafted DPR enables better project execution and subsidy acquisition
  • Sigma Solutions provides expert, fast, and result-driven DPR drafting services

Related Services by Sigma Solutions

  • Government Scheme Advisory (PMEGP, Stand-Up India, DEDS)
  • Industrial and Agri-Based DPR Drafting
  • Loan & Subsidy Application Support
  • FSSAI, GST, Udyam Registration
  • Business Feasibility & Compliance Advisory
Other Case Studies
Client Testimonial

“I had a business idea but struggled with the paperwork and financial projections needed for my dairy farm loan. Sigma Solutions drafted a highly professional DPR that secured my funding smoothly. Their expertise in financial planning and compliance was a game changer!”
Entrepreneur, Dairy Project – Arunachal Pradesh