What is the UNNATI 2024 Scheme?

UNNATI Scheme

The Uttar Poorva Transformative Industrialization Scheme (UNNATI), 2024 is a flagship initiative by the Department for Promotion of Industry and Internal Trade (DPIIT) aimed at accelerating economic growth in the eight Northeastern states: Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, and Tripura.

This scheme provides capital subsidies, interest subvention, and tax-linked reimbursements to eligible businesses.


🗺️ Goal of UNNATI 2024

To transform the Northeast into a dynamic investment hub by enabling:

  • Inclusive economic development
  • Employment generation
  • Sectoral diversification in industry and services

🔑 Key Objectives

  • Capital subsidies to reduce setup cost
  • Expansion support for existing businesses
  • Boost to tourism, IT, healthcare, film, and education
  • Inclusive growth in hilly, remote, and border districts

Duration: 10 years (2024–2034) with an 8-year post-approval disbursal window.


💼 Who Can Apply Under UNNATI 2024?

  • New units (industrial or service) in the Northeast
  • Expanding existing units with new investment
  • Businesses in notified eligible sectors

Eligible Sectors:

  • Manufacturing
  • Tourism & hospitality
  • Healthcare (min. 25 beds)
  • IT, ITeS, BPOs
  • Skill & education centers
  • EV infrastructure
  • Film & heritage-based tourism

📅 Step-by-Step Registration Process

🔹 Step 1: Online Application

Apply through the official UNNATI portal. Upload:

  • DPR (Detailed Project Report)
  • Land documents (ownership or lease)
  • PAN, GST, Udyam registration
  • Incorporation certificate
  • CA-certified cost statements
  • Bank loan sanction or NEDFi support letter

🔹 Step 2: District-Level Scrutiny

  • DIC officer conducts site visit with geo-tagging
  • Verifies infrastructure, documentation, and status
  • Submits eligibility report to State Authority

🔹 Step 3: State Committee Review

  • State-level screening by:
    • Industry Secretary
    • Director of Industries
    • NEDFi and Finance Dept.
  • Forwarded to DPIIT for final approval

🔹 Step 4: DPIIT Central Approval

  • Central committee meets monthly
  • Upon approval, a digital Certificate of Registration is issued

Processing Time:

  • DIC: 45 days
  • State Committee: 90 days
  • DPIIT: 30 days
  • Total time: ~4 months

💰 Financial Incentives Offered

✅ 1. Capital Investment Incentive (CII)

Reimbursement for:

  • Plant & machinery (manufacturing)
  • Durable assets & equipment (service)

✅ 2. Capital Interest Subvention (CIS)

  • Partial interest reimbursement on eligible term loans

✅ 3. GST Linked Incentive (GSTLI)

  • Net GST (output – input credit) reimbursement based on turnover

Note: Separate claims must be filed post-expenditure for each incentive.


🏢 What’s Covered & What’s Not?

🏠 Manufacturing Units (Covered)

  • Production machinery
  • Electrical equipment
  • Solar integration
  • Safety systems linked to production

Not covered: Civil works, sheds, DG sets, working capital, furniture, raw material

🏛️ Service Sector Units (Covered)

  • Hotels, resorts, homestays (Tourism dept. registered)
  • Film studios, theaters, rental equipment
  • Heritage sites reused for tourism/hospitality
  • Hospitals (25+ beds)
  • Diagnostic labs, not OPDs or chemist shops
  • BPOs, coding bootcamps, training centers
  • EV charging grid, software, and infra

⚠️ Restrictions & Conditions

  • You can’t claim the same incentive under more than one scheme
  • If you’ve claimed part subsidy under another scheme, GSTLI can still be availed
  • Submission of compliance undertaking is mandatory
  • False claims lead to rejection and blacklisting

📸 Transparency & Monitoring

  • Geo-tagged site verification
  • Digital communication of status
  • Rejected applications include reasons
  • DPIIT publishes monthly minutes

🔹 Use Case Examples

🏨 Tawang Homestay Owner

  • Eligible for kitchen/room equipment subsidy
  • GST reimbursement
  • Term loan interest relief

🏥 Itanagar Hospital

  • 30-bed facility gets medical equipment subsidy
  • GST benefit on services
  • Loan interest support

💻 Tech Skill Center

  • Capital support for training infrastructure
  • GSTLI after operational turnover
  • Linked with Startup India for dual benefit

🔹 Why UNNATI 2024 Matters

For decades, industries avoided the Northeast due to terrain and policy gaps. UNNATI 2024 bridges that gap with:

  • Strong policy and financial push
  • Transparent approvals
  • Dedicated subsidy windows for local sectors

It’s an opportunity to build industries, empower youth, and modernize infrastructure across the region.


🤝 Let Sigma Solutions Help You Succeed

Sigma Solutions simplifies the entire UNNATI process for you:

We Offer:

  • ✅ DPR Preparation & Eligibility Check
  • ✅ Portal Registration & Document Upload
  • ✅ Compliance Filing & Claim Assistance
  • ✅ Pre-site Inspection Preparation
  • ✅ End-to-End Monitoring & Liaison

📞 Call Us Today: +91-9084729472
🌐 Website:www.sigmasolutions.in
📧 Email:[email protected]

Scroll to Top
DMCA.com Protection Status